| Beskrivelse |
Årstall |
| TP1 Support columns |
1975 |
| TP1 Support truss |
1975 |
| TP1 Permanent platforms in columns |
1975 |
| General arrangement - east elevation |
1976 |
| P&ID Glycol contractors |
1976 |
| TP1 Seperator & spherical pig receiver |
1976 |
| P&ID pig receiving traps & methanol inject |
1976 |
| TP1 Perspective |
1976 |
| Perspective of TP1 platform |
1980 |
| Plot plan upper level |
1985 |
| Plot plan lower level |
|
| Plot plan cellar deck |
|
| General arrangement of column C1 on TP1 |
|
| General arrangement of column C2 on TP1 |
|
| P&ID pig receiving traps & methanol inject |
|
| P&ID FWKO separators & spherical pig rec |
|
| P&ID sales gas metering system |
|
| P&ID glycol contractors |
|
| P&ID utility flowsheet firewater pumps |
|
| P&ID untility flowsheet diesel and gas tu |
|
| System isometric of mail gas (sht 1 of 2) |
|
| Isometric view of firewater piping at V3 & |
|
| Plan of flooding dewatering bypass arrangement |
|
| TP1 sign plate |
|
| Load diagram el (+)23008 |
|
| Load diagram el (+)29548 |
|
| Load diagram el (+)37168 |
|
| Location of life boats sht 1 of 3 |
|
| Location of lifeboats sht 2 fo 3 |
|
| Location of lifeboats sht 3 of 3 |
|
| General arrangement column C1 material han |
|
| 5 5 KV one line diagram of protection relay |
|
| MCC marshalling box wiring MB1 left |
|
| Right side marshalling box MB2 wiring |
|
| Key plan of co-ordination drawing for column |
|
| System isometric of firewater for treatment |
|
| Deck units |
|
| Modules |
|
| TP1 - Navigational light during tow out |
|
| TP1 - General isometric view of platform |
|
| Modules installation sequences sheet 1 |
|
| TP1 firewater system piping |
|
| TP1 Identification plate |
|
| GBS |
|
| General arrangement of column 1 on TP1 platform |
1982 |
| General arrangemetn of column 2 TP1 platform |
1982 |
| Simplified flooding and dewatering P&ID |
2003 |
| GBS Outside GBS General |
|
| Eral perspective view NE and NW sides(A3 & A4) |
1984 |
| General perspective view SE and SW sides (A3 & A4) |
1984 |
| Operation ares of crans |
1984 |
| Relations MLW VS construction levels (A3 & A4) |
1984 |
| General perspective view NW and SW sides (A3 & A4) |
1987 |
| General perspective view NW and SW sides Glossary (A3 & A4) |
1987 |
| General plan view |
1987 |
| GBS Roof plan views |
|
| Roofs plan view general layout (A3 & A4) |
1984 |
| GBS Structural drawings inside the columns |
0000 |
| Grating plan column 2 level + 17.300 |
1984 |
| Grating plan column 1 level + 18.300 |
1984 |
| Grating plan column 1 level + 5000 |
1984 |
| AS Built existing framing col. C1 level +12400 |
1986 |
| AS Built existing framing column 1 level + 5000 |
1986 |
| AS Built Existing framing column 2 level + 12.400 |
1986 |
| AS Bulit existing framing column 2 level + 17.300 |
1986 |
| AS Bulit wxisting framing column 2 level + 5000 |
1986 |
| AS Bulit exixting framing column 1 level + 18.300 |
1986 |
| Grating plan column 2 level + 12.400 |
1986 |
| Grating plam column 1 level + 12.400 |
1986 |
| Grating plan column 1 level + 5000 |
1986 |
| GBS Structure |
0000 |
| Elevation east side(A3 & A4) |
1984 |
| Elevation North side (A3 & A4) |
1984 |
| Elevation South side (A3 & A4) |
1984 |
| Section through columns (A3 & A4) |
1984 |
| Concrete structure plan view (A3 & A4) |
1987 |
| Plot plans |
|
| General arrangement - East elevation ELN-2099-004 |
1975 |
| General arrangemant - South elevation ELN-2099-003 |
1975 |
| Load plan modules AS Built |
1990 |
| Load plan pancakes As Built |
1990 |
| Plot plan - lower level |
1999 |
| Plot plan - upper deck |
1999 |
| Plot plan - cellar deck |
2002 |
| Plot plan - upper level |
|
| Perspective of TP1 Platform |
|
| Plot plan - lower level |
|
| Plot plan - cellar deck |
|